361 |
Letter regarding detailed project reports readily available with the states (02.09.2016) |
02/09/2016 |
Download (58.45 KB) |
Jal Jeevan Mission |
362 |
Letter regarding utilization of flexi fund (30.08.2016) |
01/09/2016 |
Download (31.38 KB) |
Jal Jeevan Mission |
363 |
Letter regarding updation of physical progress of PWS schemes in terms of Milestones in IMIS of the Ministry (31.08.2016) |
31/08/2016 |
Download (239.54 KB) |
Jal Jeevan Mission |
364 |
Letter regarding video Conference on 31.8.2016 for discussing progress of SBM(G) (30.08.2016) |
30/08/2016 |
Download (387.44 KB) |
Swachh Bharat Mission |
365 |
Letter regarding updation of Geo tagging information of Drinking Water Supply schemes in IMIS of the Ministry (30.08.2016) |
30/08/2016 |
Download (615.53 KB) |
Jal Jeevan Mission |
366 |
Letter regarding maximizing the outcome out of availability of funds under NRDWP (24.08.2016) |
26/08/2016 |
Download (464.7 KB) |
Jal Jeevan Mission |
367 |
Letter regarding change in National Workshop location of Two day National Workshop for Strengthening the NRDWP scheme on 09th & 10th September, 2016 (26.08.2016) |
26/08/2016 |
Download (362.04 KB) |
General |
368 |
Letter regarding visit of 120 districts of phase-I Swachh Bharat Mission |
24/08/2016 |
Download (628.77 KB) |
Swachh Bharat Mission |
369 |
Letter regarding assurances given in the Lok Sabha regarding PPP Model (24.08.2016) |
24/08/2016 |
Download (585.58 KB) |
Jal Jeevan Mission |
370 |
Letter regarding data entry of ongoing schemes in IMIS(NRDWP) (19.08.2016) |
22/08/2016 |
Download (238.79 KB) |
Jal Jeevan Mission |